Daiki Axis Bangladesh Successfully Implements Johkasou STP at Dr. Fazle Rabbi park police box, Gulshan 1, Dhaka.
PROJECT INFORMATION
- Project Name: Dr. Fazle Rabbi park police box
- Category: JohkasouSTP
- Capacity: 2 m3/day
- Location: Gulshan 1, Dhaka
- Client: DNCC
- Work Status: 2023
Details of This Project
Daiki Axis Bangladesh is the best wastewater treatment plant supplier in Bangladesh and has successfully installed a Johkasou Sewage Treatment Plant (STP) at the Dr. Fazle Rabbi Park police box, Gulshan 1, Dhaka. This project has an STP (capacity of 2 m3/day). The modules are made of FRP. There is 1 blower and a pump for pumping the raw water from the raw water tank. The final treated water goes into the drain.
This project reflects our commitment to providing eco-friendly and effective STP solutions across Bangladesh.
Features of this STP Project
- Capacity: 2 m³/day
- Modules made of FRP (Fiber Reinforced Plastic)
- Includes 1 blower for aeration
- Equipped with a pump for transferring raw water from the raw water tank
- Final treated water is discharged into the drain
- Installer: Daiki Axis Bangladesh
Process Flow of the STP
The Johkasou STP at the Dr. Fazle Rabbi Park police box, Gulshan 1, Dhaka, follows a systematic treatment process:
- Separation Box: Separate solids in wastewater by gravity and prevent the agitation of the excess sludge in the Sedimentation & Separation Chamber by influent.
- Separation & Sedimentation Chamber: Separate solid debris or impurities from water in influent and circulated water and store these sediments in the chamber. Accumulated sludge should be desludged from the tank periodically, at least once in 6–12 months.
- Anaerobic Chamber: It is filled with filter materials, which separate solids and keep anaerobic microorganisms from decomposing organic matter.
- Moving Bed Chamber: It is filled with mesh cylindrical media, which retain aerobic microorganisms to decompose and remove organic matter from wastewater.
- Sedimentation Chamber: In order to obtain clear treated water, separate the excess sludge (suspended solids, SS) by gravity. The settled sludge is constantly returned to the sedimentation & separation chamber by the airlift pump.
- Disinfection Chamber: Disinfect the treated water to discharge to the river or other water bodies.
The entire system operates seamlessly, ensuring effective sewage treatment with minimal environmental impact.
Process Flow of This Project

Why Choose Daiki Axis Bangladesh for STP Solutions?
As a subsidiary of Daiki Japan, we bring the expertise and innovation of Japanese wastewater treatment technology to Bangladesh. We are the top onsite STP supplier in Bangladesh. Our commitment to quality ensures that each Johkasou system meets the specific needs of the Bangladeshi environment and supports a sustainable future.
- Expertise in implementing advanced Japanese sewage treatment technology.
- Compact, energy-efficient designs tailored to client needs.
- Proven track record of successful projects across Bangladesh.
The Johkasou STP at the Dr. Fazle Rabbi Park police box, Gulshan 1, Dhaka is a perfect example of sustainable wastewater management.
Why STP need for everywhere in Bangladesh?
Sewage Treatment Plants (STP) are very important for Bangladesh to keep the environment clean and safe. With more people and industries growing every day, untreated sewage is causing serious problems. Dirty water from homes and factories often goes into rivers and ponds, making them unsafe for drinking, farming, or fishing. This pollution also harms fish and plants.
STP clean this dirty water, removing harmful things before it goes back into nature. Without proper treatment, sewage can spread diseases like cholera and diarrhea, putting many lives at risk. In crowded cities, STPs help manage waste, prevent bad smells, and stop water from flooding the streets. They also protect our natural surroundings and make sure water stays usable for future generations. As floods and rising sea levels become bigger challenges, STPs are needed to keep communities safe and healthy. Investing in STPs is an investment in a better, cleaner Bangladesh.
Bangladesh’s Urgent Need for Wastewater Treatment Solutions
Bangladesh, with its many rivers, relies on these waterways for farming, fishing, and transportation. But rapid growth in cities and industries has caused serious pollution. Rivers like the Buriganga are so polluted they can no longer support life, and others like the Shitalakhya, Turag, and Balu are also in danger.
Right now, only about 405 rivers are still active, and many of them are at risk due to pollution and illegal activities. This is a serious problem that needs to be solved quickly.
To protect our rivers, Bangladesh needs to adopt better wastewater treatment methods. One effective solution is the Johkasou system, which helps clean wastewater before it reaches the rivers. Here’s how it can help:
- Cut down on pollution: By cleaning wastewater before it flows into the rivers, we can reduce pollution.
- Help nature recover: Cleaner rivers will bring back fish and other wildlife, helping the environment heal.
- Follow the rules: The Johkasou system meets the standards set by the Department of Environment (DoE) and Environmental Conservation Rules (ECR), making sure wastewater is safely treated.
It’s crucial for Bangladesh to act now. Treating wastewater will not only clean up our rivers but also protect public health and create a safer environment for everyone.
A Sustainable Future for Bangladesh
Investing in waste water treatment isn’t just about cleaning up rivers—it’s about building a healthier, more sustainable future for Bangladesh. Taking action now can help preserve the country’s rivers, improve water quality, and protect the livelihoods of millions of people who rely on these waterways.
By choosing Daiki Axis Bangladesh, you get modern, reliable, and eco-friendly solutions tailored to your needs. Contact us today to learn more about our projects and services.
Explore Our Featured STP Projects
STP at Hotel Sayeman Heritage.
Category: Johkasou STP
Capacity: 80 m3/day
Location: Cox’s Bazar
Client: Gasmin Limited
Year: 2021
STP at Barishal cantonment, Lebukhali, Barishal
Category: Johkasou STP
Capacity: 100 m3/day
Location: Lebukhali, Barishal
Client: MES
Year: 2022
Tangail Medical College Hospital
Capacity: 250 m3/day
Location: Tangail Sadar, Tangail
Client: PWD
Year: 2021
Project Name: Mayor’s House (DNCC)
Category: Johkasou STP
Capacity: 10m3/day
Location: Sector: 04, Uttara, Dhaka
Client: Mayor MD. Atiqul Islam
Year: 2022
Project Name: Dhaka Cantonment
Category: Johkasou STP
Capacity: 5m3/day
Location: Dhaka Cantonment
Client: Dhaka Cantonment
Year: 2020
Project Name: Mohakhali Public Toilet
Category: Johkasou STP
Capacity: 5 m3/day
Location: Mohakhali Rail Crossing
Client: DNCC
Year: 2021